Purpose - Normalization of milk on fat in a stream (in receptions of milk processing factories)
Control mode - automatic
Capacity - 5.0, 10.0, 15.0 m3/h

Purpose

Normalization of milk on fat in a stream (in receptions of milk processing factories).

Operating mode

  • automatic.

Foto

Установка серии "НОРМА 1"
Установка серии "НОРМА 1"
Установка серии "НОРМА 1"

The basic functions 

  • Automatic control of a preset value of a mass fraction of fat of the normalized milk in a stream;
  • The control of a mass fraction of fat normalized, normalized and skim milks;
  • Registration of fat content of the normalized milk in a stream;
  • The control of charges and amounts of products.

Features of installation 

  • Interface on a network with a personal computer or top level ASUTP;
  • Full automation of work of installation (including a mode of a CIP-washing);
  • Archive and conducting technological magazine in real time.

Principle of work of installations

The principle of work of installations of a series «NORМА-1» consists in mixing normalized milk and a normalizing product (cream or skim milk) submitted pumps in the certain parity of their amounts and definition of a mass fraction of fat of the normalized milk with use of a measuring-computing quality monitoring of parameter with regulation of the charge of a normalizing product.

Technical characteristics

Characteristics
Meaning
Productivity, m3/h 
5.0, 10.0, 15.0, 25.0
Mass fraction of fat of the normalized milk, % m.f.f.
1.2 - 3.2
Mass fraction of fat normalized milk, % m.f.f.
3.3 - 4.0
Average square-law deviation of a mass fraction of fat of the normalized milk from a preset value, %
 0.05
Pressure of compressed air, mPa
0.6
Voltage, V
380
Overall dimensions, mm
1550x665x1790
Weight, kg
140

Design of installations

Installation represents a modular design of full factory readiness in structure of:
  • A frame carrying;
  • Counters-flowmeters electromagnetic - 2 pieces;
  • The pump centrifugal;
  • Adjustable valves;
  • Trumpet обвязка with armature;
  • A sampler;
  • A control panel.

Technical and economic features

(In comparison with process of normalization in tanks) 
  • Due to economy of dairy fat up to 0,02 %, economy on use of initial milk with conditional fat content of 3,4 % (at an average indice of volume of normalized milk 50 ton/day) will make nearby 3 ton/day;
  • Reduction of time of primary processing milk, an opportunity of connection is direct in the plan of pasteurization;
  • The recoupment of installation «NORМА-1» makes 2-3 months.
IF YOU HAVE QUESTIONS, SET THEM TO US!