ECE "TECHNOKOM" - the engineering and commercial enterprise focused on development and supply of equipment for the enterprises of the food industry

 

 

 

 

 

+7 (496) 575-32-72
ContactsCall back
Purpose - Preparation for filling kegs with beer, kvass, wine, drinks (with any fitting type)
Control mode - Manual
Capacity - up to 10 KEG/h

Purpose of function

Initial treatment of kegs (with all types of fittings) in order to have them ready for filling with beer, kvass (mild rye beer), wine etc., functional capacity: up to 10 kegs/hour.

Operation mode

Manual.

Picture of the Unit

KEG-Service 3T
KEG-Service 3T
KEG-Service 3T

Unit configuration

The factory-assembled unit is mounted on a skid and comprises the following parts and blocks:
  • The skid with support for keg;
  • a vat with heating elements: for cleaning solution;
  • circulation pump;
  • electric switch cabinet;
  • temperature and level transmitters;
  • pipe connections, with valves, couplings and fittings.

Operation cycle sequence

  1. Rinsing with hot water;
  2. Blowing-off with compressed air;
  3. Cleaning with hot lye solution;
  4. Blowing-off with compressed air;
  5. Flushing with cold water;
  6. Blowing-off with compressed air;
  7. Sterilization with steam *.
*  if cleaning solution contains sanification components, the sterilization with steam is no more obligative.

Key technical features

Parameter Units
Value
Performance capacity (for kegs of 50L format), pcs/h up to 10
Number of working stations (heads), pcs
1
Installed capacity, kW
5.0
Capacity of vat for cleaning solution, L
80
Volume of cleaning solution filled in the vat, L
70
Process temperature of cleaning solution, (MAX) °С
84±0,5
Cold water flow consumption, m3/h
0.1
Hot water flow consumption, m3/h
0.2
Steam consumption (at pressure 1kg/cm2), m3/h
10.0
Compressed air consumption (at 2 kg/cm2), m3/h
7.5
Pressure in municipal water pipe-line, MPa (kg/m3)
0,3 (3)
Circulation pump capacity, (MIN) m3/h
1.5
Dimensions of the Unit, mm
1260 х 575 х 1450
Weight of the Unit, kg
100
Fittings and valves standard:
according to class 2 by State Standard GOST 9544
Basic material of construction
stainless steel AISI-304 (08Х18Н10)
Ingress protection rate of switch cabinet
IP 54

Standard delivery terms for Unit “KEG-Service 3T”

Scope of services:
  • Manufacturing and supply to the Customer’s address.
List of technical accompanying documents:
  • Technical passport and manual;
  • Declaration of correspondence to requirements of the Technical Regulations of the Customs Union (TRCU).
Manufacturing time (readiness for delivery) – up to 30 days.

Guaranteed operating lifetime – 12 months.
IF YOU HAVE QUESTIONS, SET THEM TO US!
Submit
In case of information citing from a site, the reference to the source is obligatory. All rights reserved © Technokom Ltd, 2014-2023